PROJECT PROFILE

General Scope of Work and Supply

 

1.0. Overview:
1.1. Introduction:
The aim of this project is to establish a reliable electric power supply to Al Geneina city isolated grid in the west part of Sudan by the construction of a solar power project.

1.2 Metrological Data:
Maximum Temperature 50 °C
Minimum Temperature 10 °C
Average Humidity 30%
Pollution level Normal

2.0. Technical Scope
The Project will require the design, engineering, procurement, construction, testing, commissioning, operation, and maintenance of a fixed tilted ground-mounted photovoltaic power plant of approximately 2 MWp installed PV power together with associated infrastructure and facilities.

2.1. Location
Al Geneina city is in the west region of Sudan at 13°26′N 22°26′E. The PV plant will be located in the southeast of Al Geneina city. The average annual solar irradiation rate is high at 2,370 kWh/m2. The terrain is flat and suitable for PV applications. The total available area for the PV plant is approximately one square kilometer.

 

To learn more, kindly download the file below:

Project Information

  • National Priorities

    2- Stabilize the Economy, 8- Youth Employment

  • SDG Goals

    7- Affordable and Clean Energy, 8- Decent Work and Economic Growth, 9- Industry, Innovation, and Infrastructure

  • Project Type

    Development, Investment

  • Status

    High Impact

  • Entity Type

    NGO

  • Stage

    Ready for Funding

  • Timeline

    2021

Project Manager Contact

  • Phone
    +249 91 958 0997
  • Project Manager
    Dr. Mutwakkil